Education
Marks Heeley Ltd were engaged by Galliford Try as part of their design and build bid for a major refurbishment of the structural/mechanical Laboratories at the De Montford University, Leicester.
The works generally comprised the provision of a large mezzanine floor with office accommodation over and link bridges to existing surrounding mezzanine walkways.
Employers information provided structural engineering proposals in respect of the works and providing a large number of internal columns to the ground floor footprints.
Marks Heeley Ltd developed a alternative solution making use of long span asymetric cell beams with an insitu/composite concrete slab on super holorib decking.
Feature columns were provided using circular hollow sections and adjacent the existing perimeter walls of the laboratory buildings.
Address Marks Heeley Ltd, Suite One The Stables, Cannons Mill Lane, Bishops Stortford, Herts, CM23 2BN
Phone 01279 465900
Mail general@marksheeley.co.uk