Unilever

Industrial

MH carried out full engineering design services on this highly serviced modern laboratory centre.

The buildings constructed in two phases provide 5400m² of laboratory and related facilities with extensive plant rooms of 1875m² at second floor (roof level).

The buildings are constructed on piled foundations, with a two storey insitu concrete frame and steelwork roof structure. The buildings have a 9.0 x 9.0m grid providing large column free zones and flexibility for future reconfiguration. At ground level, mass concrete isolation bases are provided for the support of highly sensitive.

Share Tweet Pin it